RebusCom wrote:I replaced a problematic TS-8 Pro with one of the 8-port Netonix switches.
This was after an older TS-8 had already been replaced with a new TS-8 with no change in performance. I had also tried an HP Procurve in place of the TS to see if performance would improve but still had limited throughput. There is a mix of GbE and FastE.
After swapping in the Netonix, throughput has quadrupled.
Yes, I've ordered more.
What's the latest ETA on the 12 port AC?
I am REALLY glad you like it!
I will have ALL of the announced
switches on display at WISP America.
Production of the new small 12 port WS-12-250-AC and DC is end of March beginning of April.
We do have PLENTY of 24 ports and 12 port rack mounts and a FEW pre-release WS-8-250-AC available NOW
and starting 2nd week of March a lot of production WS-8-250-AC.
People who got EARLY releases of our switches really need to enable Flow Control in the UI because we did not used to have it on by default and it is really needed with a mix of 1G uplink and 100M AP's.
I have made tons of Post explaining why you want to turn on Flow Control:
viewtopic.php?f=25&t=420&p=2543&hilit=packet+buffers#p2607Not that I like Flow Control but in these situations you do need it and our switch core does an Excellent job of implementing Flow Control with back pressure.