DC Power Setup at Tower Sites
Posted: Wed Jun 21, 2017 11:59 am
We are starting to deploy 24v and 48v DC power at our Broadcast sites with our Netonix 250 DC switches.. can people post pics of their DC setups? Trying to get ideas of what works best in various space constraints.
We are planning on using the Ubnt EdgePower at the ground feeding 48v up the tower where our netonix switch is located. I have (4) Optima Blue top batteries, what are the recommendations for a battery charger?
Thanks!
Jordan