Battery backup setup
Posted: Wed Mar 02, 2016 6:50 am
by colinhowlin
Hi
Looking to deploy a WS-12V-DC on one of our sites with a battery backup system in place.
New territory for me - how does everyone else do this?
What gear do you use as far as battery, controller etc are concerned?
Thanks
Colin
Re: Battery backup setup
Posted: Thu Mar 03, 2016 9:24 pm
by rockhead
I reaaaaaly like AGM batteries as they are unspillable and will only off gas if massively overcharged. Samlex makes good simple reliable charge controllers, there are many more.
Re: Battery backup setup
Posted: Thu Mar 03, 2016 9:30 pm
by sirhc
If using a WS-12-DC unit you need 48V +/- conditioned power.
The WS-12-250-DC unit will accept 9-60V unconditioned power.
Re: Battery backup setup
Posted: Fri Mar 04, 2016 5:48 am
by colinhowlin
Thanks,
When you say it needs 48V+/- conditioned, I take it there is very little tolerance for voltage fluctuations?
So what's my shopping list!
I need something to take mains AC (240V), which will be used to primarily power the switch.
Batteries are for backup in case of mains failure.
Controller?
Rectifier?
Pretty clueless in this area.
Re: Battery backup setup
Posted: Fri Mar 04, 2016 9:19 am
by sirhc
If you are on grid then I would do this:
Trip Lite 750 or 1250 watts inverter charger
They make 120V and 220V versions.
http://www.tripplite.com/products/power ... hgod-woOKQ2 to 4 AGM 12V batteries
I use Optima Blue top
http://www.optimabatteries.com/en-us/pr ... hgodYXMFEgI would use an AC powered switch not a DC switch since your on grid
All this information and more is already on this forum and discussed many times just do some searching
Re: Battery backup setup
Posted: Fri Mar 04, 2016 10:20 am
by lligetfa
I guess it boils down to how (un)reliable the grid is and how much offgrid runtime is needed. A UPS is simpler but will limit the runtime. Once power fails, you are babysitting it more than a DC site. A UPS may need additional monitoring to know when to ignore the alerts and when to act. Also depends on what mitigation steps are available. Do you drag out a genset? Shed load?